3.10.2009

Maggienose



pic by Becky

3.09.2009

XVII

Paint samples before deciding on a color and here's why...



Yeesh. Guess we'll see what 7+ has to offer!

3.08.2009

Day Sixteen - Grout

Grout! Oh baby, it's coming together. Shower soon.


3.06.2009

Two Weeks! Two Weeks!



Today, at 2:50PM Eastern Standard Time, I placed the last wall tile in its spot. Man did that feel good. There's still a whole bunch to do before it's finished, and a couple of little tile details on the floor I need to take care of, but moving past the noise and mess of cutting and gluing tiles all day long is a huge relief.


Becky had a great idea for capping the edge of the shower tiles with quarter-rounds I bought to edge the floor. It makes the transition from tile to [what will be] painted wall more finished looking. I'm glad I went back and redid the tiles framing the soap/shampoo niche as I can now say free of hyperbole that it looks a zillion times better.


I had the end of the project clear enough in my mind that I was able to take the time to make dinner for the first time in days. Pasta with a braised short-rib ragu. It was pretty worthy.

3.04.2009

Day Thirteen - Clog Free...sorta


Joe came this morning with his son Joe, and installed the sink, shower fixtures and straightened the toilet. It was really nice to have some parts of the final picture completed. The fixtures operate smoothly and solidly, and they're nice and shiny.


Much of my worry was relieved when Tony the sewer guy came by and unstuck the boulder I'd grown in the tub's drain. We talked about Scrubs, Friday Night Lights and Willie Randolph.

Apparently, this is the face I make when I'm stressed, hungry and eating my breakfast that I made hours ago, moments before Joe arrived to get to work. I will try and avoid that combination of circumstances and thus, this face, in the future.


I messed up the edging around the shampoo niche. It's going to set me back a bit to redo it, but after so many days of hardwork, to not set it right on account of a couple hours and dollars...anyway, I'll fix it tomorrow. I think the tiling will be done by the end of the day. I will rejoice. Sushi tonight. Yum.

3.03.2009

Day Twelve - Still Still Tub

Mini melt-down this afternoon, slow going, but then a strong finish in the waning hours of the day. Chicken, beans and rice for dinner. We're getting verrrry close to finishing the tile...I can taste it. Literally: the tile saw spews a lot of clay dust into the room. The plumbers turned the tub problem over to a sewer guy who will be here tomorrow. That news was part of the melt-down. Tomorrow is a big day!

3.02.2009

Days Ten & Eleven

I thought the shower would be entirely tiled by the end of today, but no. Ugh. Mike works with a diligent perfectionism that is fun to have around, and I think we should be done with the shower tomorrow. There is an obstacle though. The tub is stopped-up and filled with water from work and cleanup. I sure hope we can get someone here in the morning to free-up the drain so we can get back to work.